Wednesday, July 22, 2009

7-22-09

Today was actually a really busy day. We laid about half the rebar for the slab. We were going to get the fireplace slab poured but the framing was the wrong size (that might have been my fault). Dustin had the concrete mixer up there and while he was mixing the latch came undone and concrete spilled everywhere. Also the lady from the Bozeman Chronicle came up to do a story on the project. http://picasaweb.google.com/Blackmore.Pavilion/72209##

No response to “7-22-09”

Leave a reply

 
© 2009 Blackmore Pavilion. All Rights Reserved | Powered by Blogger
Design by psdvibe | Bloggerized By LawnyDesignz